3-2. NEOLIUM BOX 200/250/300 1.00m platform assembly
• Assemble the castor wheels by following §3-1-1.
• Assemble the braces by following §3-1-2.
• Mount the guard rail on rungs no. 7, and then no. 2, by following §3-1-6.
• Mount the platform on rung no. 3 by following §3-1-7.
3-3. NEOLIUM BOX 200/250/300 1.00m platform assembly
• Assemble the 2 x 2.00m extensions by following § 3-1-5.
• Assemble the 2 guard rails on rungs no. 15, and then no. 10, by following § 3-1-6.
• Mount the box platform on rung no. 11 by following § 3-1-7.
106-A000035566 - ind.D - 11/2021
61