3-4. NEOLIUM BOX 200/250/300 4.00m platform assembly
• Closely follow the whole of §3-1 to assemble the NEOLIUM BOX 200/250/300 2.00m platform.
• Assemble the 2 x 2.00m extensions by following § 3-1-5.
• Assemble the 2 guard rails on rungs no. 19, and then no. 14, by following § 3-1-6.
• Mount the box platform on rung no. 15 by following § 3-1-7.
3-5. NEOLIUM BOX 200/250/300 5.00m platform assembly
• Closely follow the whole of §3-3 to assemble the NEOLIUM BOX 200/250/300 2.00m platform.
• Assemble the 2 x 2.00m extensions by following § 3-1-5.
• Assemble the 2 guard rails on rungs no. 23, and then no. 18, by following § 3-1-6.
• Mount the box platform on rung no. 19 by following § 3-1-7.
106-A000035566 - ind.D - 11/2021
62