3-7. NEOLIUM BOX 200/250/300 7.00m platform
• Closely follow the whole of § 3-5 to assemble the NEOLIUM BOX 200/250/300 5.00m platform.
• For the 7m platform and above, the stabiliser + extension set replaces the basic stabilisers.
• Assemble the stabiliser extensions by following § 3-8-1 p.25.
• Assemble the 2 x 2.00m extensions by following § 3-1-5.
• Assemble the 2 guard rails on rungs no. 31, and then no. 26, by following § 3-1-6.
• Mount the box platform on rung no. 27 by following § 3-1-7.
Collar clamp position:
Between the 2
and the 14
106-A000035566 - ind.D - 11/2021
nd
rd
and 3
rungs,
th
th
and 15
rungs
64