Preliminary operations
4.4
PREPARATIONS FOR ASSEMBLY
The assembly of the operator requires a series of preliminary
operations on the door to be carried out directly on the site, if
the door has already been fi tted. It is therefore necessary to
prepare the necessary tools required by the fi tter.
Information
The list of tools required is shown in the fi gure, and in
the table, (fi g.9).
Basic tools and materials required
•
lectric disk grinder: 230V.
•
Protective goggles
•
Electric welder: 230V./100 Amp.minimum
•
Protective mask
•
Electrodes min. dia. 2
•
Soft-solderer
•
Electric drill
Power supply: 230 V.
•
Drill bits
•
Hollow mill dia. 67 for holes to house photocells and
pushbuttons
•
Extension cable for electrical equipment
•
Electric cable, section 1.5 mm2, various colours+ various
cable terminals
•
Electrician's scissors
•
Pliers for cable terminals
•
Tester
•
Gauge indicating hundredths
•
Rule
•
Protractor
•
Dynamometer
•
Plumbline
•
Spirit level (three-dimensional)
•
Graphitized grease.
•
Can of Zincospray
•
Rustproof paint
•
Paint brushes
•
Paint thinner for cleaning brushes
•
Metal brush
•
Various fi les
•
Iron saw
•
Scoring bits
•
Hammer
•
Steel and masonry chisel
•
Cleaning tissues
•
Paper towels
•
"First Aid" box
•
Clamps or "grip" grippers