Descargar Imprimir esta página

Preparation For Assembly - Aprimatic EM 51 ALZO Instrucciones Para La Instalación

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Preliminary operations
4.4
PREPARATIONS FOR ASSEMBLY
The assembly of the operator requires a series of preliminary
operations on the door to be carried out directly on the site, if
the door has already been fi tted. It is therefore necessary to
prepare the necessary tools required by the fi tter.
Information
The list of tools required is shown in the fi gure, and in
the table, (fi g.9).
Basic tools and materials required
lectric disk grinder: 230V.
Protective goggles
Electric welder: 230V./100 Amp.minimum
Protective mask
Electrodes min. dia. 2
Soft-solderer
Electric drill
Power supply: 230 V.
Drill bits
Hollow mill dia. 67 for holes to house photocells and
pushbuttons
Extension cable for electrical equipment
Electric cable, section 1.5 mm2, various colours+ various
cable terminals
Electrician's scissors
Pliers for cable terminals
Tester
Gauge indicating hundredths
Rule
Protractor
Dynamometer
Plumbline
Spirit level (three-dimensional)
Graphitized grease.
Can of Zincospray
Rustproof paint
Paint brushes
Paint thinner for cleaning brushes
Metal brush
Various fi les
Iron saw
Scoring bits
Hammer
Steel and masonry chisel
Cleaning tissues
Paper towels
"First Aid" box
Clamps or "grip" grippers
Pos. Tool
Combination wrench 8
1
2
Allen key 3
Fig.9
2
1
- 16 -
2
1

Publicidad

loading