Descargar Imprimir esta página

Spencer JACK-E Serie Instrucciones De Uso página 20

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Operating class (Power series only)
Auto-off time after inactivity
Note: Overall dimensions refer to trolley with wheels in direction of travel.
TABLE OF OPERATING CHARACTERISTICS:
JACK - E
JACK-E 4RG
JACK-E 4RG TWIST
JACK-E LIFTING TROLLEY W/HANDLES
JACK-E 4RG W/HANDLES
JACK-E 4RG TWIST W/HANDLES
POWER JACK-E
POWER JACK-E 4RG
POWER JACK-E 4RG TWIST
POWER JACK-E W/HANDLES
POWER JACK-E 4RG W/HANDLES
POWER JACK-E 4RG TWIST W/HANDLES
The position of the machine's centre of gravity is not indicated as it varies depending on the height position of the machine.
Furthermore, in terms of safety, the centre of gravity varies depending on the load placed on the machine.
It is therefore essential to assess the stability of the machine in relation to the load applied.
9.
INSTALLATION AND COMMISSIONING
9.1
INSTALLATION
The product does not require installation but upon receipt check that:
• Packaging is intact and has protected the device during transportation
• Check that all parts included in the packing list are present
• The device does not show any damage
IT
DO NOT DISASSEMBLE PARTS OR COMPONENTS OF THE DEVICE OTHER THAN THOSE EXPRESSLY INDICATED IN THIS MANUAL.
• The warranty shall become invalid if tampering and/or any type of operation other than that provided for in this manual were to occur.
9.2
COMMISSIONING
EN
OIL-PRESSURED JACK-E
Before commissioning the device, place it on a flat surface and check that there is no oil leakage.
A. Check that the amount of oil required for proper operation is present.
B. Check the tightness of the fittings/caps.
C. After the first few drives, visually check that no flanges are leaking oil. The movements made must make maximum use of the rod travel.
DE
If the above checks are successful and the product is operating correctly, it can be considered fit for use. If not, please refer to the maintenance and/or fault management
section.
POWER JACK – E
The trolleys in the Power series are supplied with a factory pre-charged battery.
FR
However, it is advisable to check the charging status of the battery before commissioning the device. To do this, press the button on the battery itself; the LEDs corresponding
to the battery charge level will light up.
If the battery is charged, place the product on a flat surface and check its functionality as described in the following paragraphs.
If the above checks are successful, the product can be considered fit for use. If not, please refer to the maintenance and/or fault management section.
CABLE CONTROL
ES
If the device was purchased complete with the accessory cable control, this is installed at the factory.
If the accessory was purchased at a later date, proceed upon receipt of the product with installation as described below:
Identify the position for the control unit support, near
the end pad on the side opposite the roller
20
S3 (85/340 s)
15 min
HYDRAULIC
ELECTRO-ACTUATED
LIFTING
LIFTING
Position the two half-shells just below the end pad and
insert the screws and nuts provided.
2 PIVOTING WHEELS
4 PIVOTING WHEEL
AND 2 FIXED
WITH BRAKE
WHEELS
Tighten the small parts as far as they will go without
excessive force.
4 PIVOTING WHEEL
HANDLES
WITH BRAKE AND
TWIST SYSTEM

Publicidad

loading