INDEX
5.2 FLOORING REQUIREMENTS
The lift must be installed on a flat, horizontal floor capable of bearing the LOADS TRANSMITTED TO THE SUPPORTING
FLOOR shown in the table (fig. B). The minimum requirements are:
a) Concrete quality: C25/30 min
b) Floor minimum thickness: 160mm (net of any floor and related screeds) (*)
It is advised to consult a qualified technician for installation suitability
(*) Minimum thickness depends on the block type used
P
MODEL
SPMA32
SPMA35
STANDARD INSTALLATION
2720 -
(2620)
STANDARD INSTALLATION
2700 -
(2600)
Mx
Mx
P
1950 kgf
2100 kgf
P
Mx
14KNm
15KNm
SPMA32 - SPMA35
170
115
30
95
Fig. A
My
My
My
7 KNm
12 KNm
Fig. B
0473-M004-0
EN_19