PRE-INSTALLATION
UPPER RAIL PREPARATION
right-hand installation
final limit
bracket
©Bruno Independent Living Aids, Inc.
Fig. 1
Fig. 2
UPPER END
slow-down
OF RAIL
strip
charge
contact
Fig. 3
®
1. Place upper rail section on saw horses.
2. Attach charge contact to the slow down
strip (Fig. 1).
3. If previously removed, slide charge strip
carrier into back side of rail.
4. Slide charge contact assembly from Fig.
1 into back side of rail. Assembly will fit
snugly against charge strip carrier.
NOTE: Carrier may be longer than joint
end of rail at this point .
5. Using two (2) self-drilling
hex head screws, secure slow
down ramp to rail. See Fig. 2.
NOTE: Confirm that slow down ramp
is parallel to charge strip carrier,
and touching top edge of carrier .
6. Remove charge contact assembly from rail
and save for later use.
7. Mount final limit bracket: Upper edge of
final limit bracket should be flush with
lower edge of charge contact. Insert a self-
drilling hex head screw through each screw
hole on final limit bracket into etched lines
on back of rail (Fig. 3)
10
SRE-3000 INSTALLATION 02-08-2019