Descargar Imprimir esta página

Bruno SRE-3000 ELAN Manual De Instalación página 8

Ocultar thumbs Ver también para SRE-3000 ELAN:

Publicidad

Idiomas disponibles

Idiomas disponibles

PRE-INSTALLATION
LOWER RAIL PREPARATION
Fig. 5
Fig. 6
©Bruno Independent Living Aids, Inc.
1. Before cutting rail to length, remove
Fig. 1
2. Place flat side of rail on saw horses.
shipping brace
3. Cut rail to length.
Fig. 2
4. Once rail is cut, deburr cut end using a
1-1/4"(32 mm)
Fig. 3
Fig. 4
5. With rail still on saw horses, slide charge
6. Attach charge contact to slow down
7. Bend slow down strip tab (at opposite end
8. At bottom end of rail, slide charge contact
flush
8
®
charge strip carrier (Fig. 1). Set aside.
Then, cut rail to length required for
installation. (See page 6, Rail Measurements
to calculate.)
NOTE: Actual rail length for a 16'
two-piece rail is 15'-9" .
Draw a line at desired finished rail length.
Carefully align saw with marked cutting line.
metal file or other appropriate tool.
NOTE: Be sure to round edges that
might abrade wiring at rail end
routed to bumper .
For folding rail installations: Keep shipping
brace on folding rail, maintaining a closed
position (Fig. 2). Next, insert slow
down strip into charge contact and
fasten with two (2) self-drilling hex
head screws. Then, feed charge lead
through the hole in the rail out the cut
end of the rail.
Now, skip to Joint Preparation.
strip carrier into back side of rail (Fig. 3).
Inset carrier as noted in Fig. 3.
(communications) strip (Fig. 4).
from charge contact) down slightly (Fig. 5).
Do not let tab touch rail!
assembly from Fig. 4 into back side of rail
(Fig. 6). Assembly will fit snugly against
charge strip carrier.
NOTE: Carrier may be longer than rail
at this point .
SRE-3000 INSTALLATION 02-08-2019

Publicidad

loading

Este manual también es adecuado para:

3000-i