4. I nstal l the front and bottom pi pe assem bl y.
4. I nstal l the front and bottom pi pe assem bl y.
Fi nd the front and bottom pi pe assem bl y ( 3) .
Fi nd the front and bottom pi pe assem bl y ( 3) .
Fl at gaskets ( Φ10. 4*Φ25*2. 0( 17) are respecti vel y sheathed w i th tw o i nner hexagonal
Assembly
Fl at gaskets ( Φ10. 4*Φ25*2. 0( 17) are respecti vel y sheathed w i th tw o i nner hexagonal
head bol ts ( 3/ 8" - 16*105( 16) . Then they pass through the hol es on the front and bottom
head bol ts ( 3/ 8" - 16*105( 16) . Then they pass through the hol es on the front and bottom
pi pes and are l ocked on the correspondi ng ri ce gol d of the m ai n fram e ( 1) .
pi pes and are l ocked on the correspondi ng ri ce gol d of the m ai n fram e ( 1) .
5. I nstal l the bi g handl e assem bl y.
5. I nstal l the bi g handl e assem bl y.
Fi nd the B i g H andl e Tube A ssem bl y ( 4) .
Fi nd the B i g H andl e Tube A ssem bl y ( 4) .
The spri ng w asher M 8 ( 5/ 16) ( 19) i s respecti vel y sheathed w i th three i nner hexagonal
The spri ng w asher M 8 ( 5/ 16) ( 19) i s respecti vel y sheathed w i th three i nner hexagonal
head bol ts 5/ 16" - 18*58 ( 18) . Then the spri ng w asher M 8 ( 5/ 16) ( 19) i s fastened to the
head bol ts 5/ 16" - 18*58 ( 18) . Then the spri ng w asher M 8 ( 5/ 16) ( 19) i s fastened to the
correspondi ng m eal m oney of the m ai n fram e ( 1) by passi ng through the hol e on the bi g
correspondi ng m eal m oney of the m ai n fram e ( 1) by passi ng through the hol e on the bi g
handl e tube assem bl y ( 4) .
handl e tube assem bl y ( 4) .
The avi ati on term i nal ( D ) on the bi g handl e tube assem bl y ( 4) i s i nserted i nto the
The avi ati on term i nal ( D ) on the bi g handl e tube assem bl y ( 4) i s i nserted i nto the
i nterface of the m ai n fram e ( E ) .
i nterface of the m ai n fram e ( E ) .
RB-5.indd 15
12/19/2020 5:40:36 PM