8.10.
ROTATION OF THE COIL
If the hydraulic connections require the
rotation of the coil, then after removal of
the frontal enclosure panel proceed as fol-
lows:
– Remove the condensate drain pan.
– Remove the coil sealing cover undoing
the screws.
– Remove the screws that fix the coil and
extract the coil.
– Remove the knock-outs on the right side.
– WARNING! Before rotating the coil refer
to the coil rotation drawing.
It is important that the coil is correctly
rotated and installed.
Correctly rotate the coil and fix with the
screws previously removed. The spaces
between drain pan and the hole on the
side must be completely filled and closed
with insulating material.
– Refit the coil sealing cover and fix with
the screws.
– Close with insulating material the holes
left empty from the hydraulic connections
on the left side.
– Refit the condensate drain pan. The
condensate drain pan is designed to drain
the condensate on both sides. It is recom-
mended to use the drain connection on the
side of the hydraulic connections. Ensure
the condensate drain not used is closed
and has no leaks.
– Remove the electrical connections from
the right side.
– Move the electrical connections to the
left side passing through the grommet.
– Move the support plate, terminal block,
the earthing connection and any electrical
devices from the left to the right side.
- Refit the frontal enclosure panel.
COIL ROTATION DRAWING
A
4880950_03 - 1811
B
180°
33