Technical Specification; Hydraulic Installation - BSV BSPOOL BSsalt-10 Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.2.5.2 Technical specification

Measure
Technology
Electronics
Supply
CL measure range
Measure deviation
Operation temperature
Storage temperature
Operation maximum pressure
pH range
Calibration
Maximum time without CL on water
Maintenance period
3.2.5.3 Installation
Please, carefully follow the recommendations regarding probe installation in
order to ensure its proper operation:

3.2.5.3.1 Hydraulic installation

Attach the probe holder to the wall by means the screws and wall plugs
included in the box.
Ensure that the probe is correctly leveled.
As shown in the following Picture, the water inlet is in the lower left part of the
probe holder, while the water outlet is in the upper right side of the probe
holder.
In case a pH probe must be installed, it can be placed in the central part of the
probe holder, removing the yellow cap and install the pH probe.
Manual EVO v.4
TECHNICAL SPECIFICATION
Free chlorine, low pH dependency
Membrane. Potentiostatic 3-electrode header
Embedded in the probe. 4-20mA output
12 to 30 VDC (10mA)
0.01 to 10.0 ppm
approx. 3% every month
0 to 45ºC
0 to 55ºC
0.5 bar. Water hammer effect must be avoided.
4 to 12
Directly on BSV control panel
24h
Water test: Minimum once a week
Header-membrane change: Once a year
Electrolyte change: Every 3-6 months, depending on the
quality of the water
72 / 166

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido