Descargar Imprimir esta página

Ecolab EcoPro Instrucciones De Servicio página 139

Ocultar thumbs Ver también para EcoPro:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Hose connection with tapered part and clamping piece
1
2
3
3
1
A1
Fig. 8: Pipe-to-hose connection with tapered part
Hose
1
Union nut
2
Clamping part
3
Tapered part
4
O-ring
5
1.
Cut off the hose with a straight cut ( Fig. 8 ,
2.
Slide the union nut
3.
Slide the clamp
3
4.
Slide the hose
1
5.
Slide the tensioning piece
6.
Place the o-ring
7.
Tighten the union nut
4
5
A
B
2
4
3
1
4
5
over the hose
2
1
over the hose
.
1
onto the tapered part
towards the tapered part
3
in the groove of the suction or pressure valve
5
(for details, see
2
37
Assembly and connection
6
6
B1
Suction valve, pressure valve
6
Pipe or hose connection
A
Slide the hose onto the tapered part
A1
Valve connection
B
Tighten the union nut
B1
).
1
.
up to the stop collar (for details,
4
until you feel resistance.
4
).
B1
MAN046879 Rev. 12-12.2023
).
A1
.
6

Publicidad

loading