2.
Set the viscosity by simultaneously pressing the On/Off
approx. 3 seconds.
ð The corresponding LED (viscosity low = left, viscosity high = right) flashes green
briefly.
3.
Switch on the pump by pressing the On/Off button
ð The pump starts and the LED for the newly set metering mode flashes.
8.1
Changing a container - Empty signal
Personnel:
Protective equipment:
Important safety instructions for changing the container.
DANGER!
You must observe all safety instructions provided below to avoid injury
to personnel.
Prevent unauthorised persons from accessing the containers and train your
personnel on how to handle the dosing chemical used.
Chemical hazards (metering medium/active substance)
DANGER!
Risk of injury to the skin and eyes caused by the chemical used
(metering medium).
– Read the enclosed safety data sheet carefully before using the metering
medium.
– The safety regulations and the required protective clothing when working
with chemicals must be complied with.
– Attention must be paid to the information included on the product data
sheet for the metering medium used.
DANGER!
Hands must be washed before breaks and at the end of the working day.
Information about the usual precautions when handling chemicals and about
the use of PPE can be found on the relevant safety data sheet for the chemical
being used and must be complied with.
n
Operator
n
Specialist
n
Chemical-resistant protective gloves
n
Protective eyewear
n
Safety shoes
51
Operation
and the 'Test'
.
MAN046879 Rev. 12-12.2023
button for