Descargar Imprimir esta página

GE PP989 Manual De Instrucciones página 24

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
INSTALLING THE COOKTOP
ATTACHING A BLOWER
TRANSITION
DUCT
Use a blower transition
duct for all downward
duct
installations
to connect to 6" round standard
ductwork.
This 3VJ' x 10" rectangle to 6" round
transition
duct is available
at your local building
supply store.
Screw
(on other
side)
Remove the cardboard
packing in the blower outlet.
Install the transition
duct to the blower outlet. Secure
all joints with duct tape to assure an airtight seal.
I_]
CONNECTING
THE DUCTWORK
Connect the ductwork
prepared in Steps 5 and 6 to
the blower transition
duct.
BLOWER ELECTRICAL
CONNECTIONS
Loosen the two screws and remove and
discard the sheet metal strap covering the 5-pin
connector
on the cooktop
bottom. Save the
screws for reinstollotion
later.
WS
II
_/
anddiscardstrap
BLOWER ELECTRICAL
CONNECTIONS
(cont.)
• Connect the 5-pin plug on the blower ossemblg
to the matching
5-pin receptacle
on the bottom
of the wire enclosure.
5-pin
connectors
Fold all wires into the electrical
enclosure. Secure
the enclosure with the screws removed earlier,
making sure that no wires are trapped.
5-pin
connectors
Electrical
II
enclosure
_t,>_ =
Flexible
conduit
24

Publicidad

loading