Descargar Imprimir esta página

SFA Sanipump VX 65 Serie Manual De Funcionamiento página 86

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 258
Chemical anchor
dimensions
Table 9: Curing times of mortar cartridge
Floor temperature
[°C]
≥ +35
≥ +30
≥ +20
≥ +10
≥ +5
≥ 0
≥ -5
13
SW = Width across flats
5 Installation at Site
72-1
904.38
90-3.38
Fig. 4: Fastening the flanged bend
1. Position flanged bend 72-1 on the floor of the tank/sump.
2. Insert chemical anchors 90-3.38.
3. Bolt flanged bend 72-1 to the floor with chemical anchors 90-3.38.
SW
2
d
SW
1
1
d
2
Fig. 5: Dimensions
Table 8: Chemical anchor dimensions
Size
(d
 × l
)
1
1
M10 × 130
M16 × 190
Dry concrete
10
10
20
60
60
300
300
Sanipump VX 65/80-EN
d
t
2
1
[mm] [mm] [mm] [mm] [mm]
12
22
90
18
35
125
Minimum curing time
Wet concrete
[min]
13)
13)
t
SW
SW
M
2
1
2
d1
[Nm]
17
6
20
24
12
80
20
20
40
120
120
600
600
85 of 449

Publicidad

loading