Descargar Imprimir esta página

OHAUS Endeavor 5000 Serie Manual página 12

Ocultar thumbs Ver también para Endeavor 5000 Serie:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EN-10
Microplate Shaker Tray Configurations
1.5.6
(2) Microplates
Installation of 1.5 to 2mL Micro-Tube Rack - Microplate Shaker e-E51LDMP03
1. Turn unit off with power switch.
2. Align the Micro-Tube Rack side-to-side on the tray.
3. Press the Micro-Tube Rack in place, you will hear the Micro-Tube Rack clip into position. No mounting
screws are required.
Microplate Shaker Tray Accessories e-E51LDMP03 (available separately)
1.5.7
Installation of Deep Plate Kit, set of 4
1. Turn unit off with power switch
2. With a screwdriver remove V-Clips from top plate
3. Line up the Deep Plate Adapter with the openings on the top plate and screw in with the thumbscrew.
4. Place deep well plates on tray. If more tension is required tighten the thumbscrew to secure
the deep well pate.
Deep Plate Kit, set of 4
30772733
(4) Microplates
Sticky Mat
30770939
Endeavor 5000 Series
(2) Micro-Tube Racks

Publicidad

loading

Este manual también es adecuado para:

E-e51ld0420E-e51ld0403E-e51ldmp03