3 - INSTALLATION OF THE EQUIPMENT
3.1- General considerations
• Place the chlorine cell in a vertical position with electrical connections facing
upwards. If this is not possible, it can be assembled in a horizontal position,
ensuring that the small auxiliary electrode faces upwards.
• Place the chlorination cell in the highest position possible of the purification
circuit and always after the filter.
• If possible, it is recommended to install the cell with a by-pass system with
its corresponding shut-off valves. This is to facilitate maintenance of the cell.
• Do not place the REDOX probe (OPTIONAL) near the chlorinator cell, as
faulty readings could be made owing to the proximity of the electrolysis
circuit. Always try and ensure that the filter is between both and that there
is at least half a meter of water flow between the probe and the
chlorination cell.
The REDOX probe should be installed after the filter, but if with this layout it
is not possible to keep a minimum distance from the cell, it should be
assembled before the filter. In this case more frequent maintenance of the
probe is required (see paragraph 5.2 below in "Maintenance").
• A good earth connection is essential. Use a differential relay with max.
30mA of sensitivity.
If a good quality earth connection is not available, place an earth
connection kit between the electrolysis cell and the redox probe.