INSTALLATION
SAFETY WARNINGS FOR INSTALLATION
•
The equipment must be installed in a well-ventilated suitable room
in compliance with the laws and regulations in force.
•
Ventilation grille section and installation room aeration openings
must not be obstructed or reduced.
•
The installation room must NOT have the risk of explosion and/
or fire.
•
Before installing the equipment we recommend to carefully clean
the interior area of all fuel supply system pipes.
•
Before connecting the equipment check that the details on the
plate correspond to those of the utility supplies (electricity, gas,
light oil or other fuel).
•
Make sure the burner is firmly fixed to heat generator according to
manufacturer instructions.
•
Connect to the source of energy according to state-of-the-art stan-
dards as described in the explanatory diagrams and in compliance
with the regulatory and law requirements in force at the moment of
installation.
•
Check that the fume disposal system is NOT obstructed.
•
If it is decided not to use the burner any more, the following proce-
dures must be performed by qualified technicians:
Switch off the electrical supply by disconnecting the power cable
from the main switch.
Cut off the fuel supply using the shut-off valve and remove the
control wheels from their position.
Render harmless any potentially dangerous parts.
0006160660_202402
DRILLING GENERATOR PLATE
Drill the generator closing plate as shown in the table.
Model
I
TBG 35 220/60
215
ENGLISH
L
I
= =
I1
LØ
M
215
200 ÷ 245
M12
N Ø
145
17 / 40