36
BatteryPRO | E-HEALTH Charge 20
Multi language digital user manual
Service wiring
Ground Connection: Always connect the
n
Neutral at the service to Earth Ground. If
ground is not provided by the electrical
service then a grounding stake must be in-
stalled nearby. The grounding stake must
be connected to the ground bar in the main
breaker panel and Neutral connected to
Ground at that point
400Vac(Line to Line) Three-Phase
n
This is feed from Wye-connection
power grid, the Wall Mount DC
Fast Charger can connect to L1, L2
or L3, and Neutral. Earth ground
must be connected to neutral at
only one point, usually at the
breaker panel.
Be Aware of High Voltage!
Earth Connection is Essential!
7.3
Unpack the charger
The product is Direct current (DC) charger, the
packing design passed the packaging simu-
lation test, if the packaging is damaged cause
by overturning, falling or external impact during
transportation, it may cause the product dam-
age or defects. if there is any serious damage to
the packaging when receiving the goods, please
notify the supplier about your findings.
Receiving the DC 20KW Moveable. The product
is delivered by a transport company to a ware-
house or specified location where it will be hand-
ed over. Transporting the DC 20KW Moveable to
its final location (last mile service) is not standard
included in the order.