Control Testing
Preparing to perform a control test
Performing a control test
56
1 Get the test strip container for the
required test (e.g. triglycerides).
2 Code the meter with the code strip
belonging to these test strips (unless the
meter has already been coded with this
code strip).
3 Get the correct control solution for the test
strips.
The following description assumes that
the meter has already been coded for this
lot of test strips. If this is not the case, see
Inserting the code strip on page 37.
1 Place the meter on a level surface or hold
it in your hand. Power on the meter by
pressing the On/Off button
.