AC SWITCH (NFB) (120 V-60 Hz/15 A)/
AC SW
ON
ON
ON
ON
OFF
OFF
15A
2
1
3
2
1
AC SWITCH (NFB) (120 V-60 Hz/15 A)
1. Set the AC switch (NFB) 1 to the "ON" a
position.
2. Connect the pocket tester (AC 120 V) to
the AC receptacle (15 A) and check the
AC switch (NFB) for continuity.
No continuity → Replace the AC switch
(NFB).
SWL2170T
Pocket tester:
3. Set the AC switch (NFB) 1 to the "OFF"
b position.
4. Connect the pocket tester (AC 120 V) to
the AC receptacle (15 A) and check the
AC switch (NFB) for continuity.
Continuity → Replace the AC switch
(NFB).
SWL2150T
FUSES
CAUTION:
To avoid a short circuit, always set the
main switch to "STOP" "
ing or replacing a fuse.
1. Remove:
• Cover 5
Refer to "COVERS, PANELS, AND
SWL2280J
CAPS".
2. Remove:
• Battery bracket 1
• Battery band 2
• Battery
NOTE:
To check the fuses, slide the battery out with
the positive battery lead and negative battery
lead connected to the battery.
3. Remove:
• Starter relay 1
• Fuse 2
• Fuse (spare) 3
SWL2290J
2-23
INSP
FUSES
ADJ
YU-03112-C, 90890-03112
" when check-