THE GASEOUS FUEL
SYSTEM
Propane and Natural Gas are extremely
flammable and explosive.
Fire or explosion can cause severe burns or
death.
• LP gas is heavier than air and will settle in low areas.
• Natural gas is lighter than air and will collect in high areas.
• The slightest spark can ignite these fuels and cause an explosion.
The information provided below is to assist
gaseous fuel system technicians in planning
installations.
be interpreted to conflict with applicable fuel gas
codes. Consult with your local fuel supplier or
Fire Marshall if questions or problems arise.
Consult with the Home Standby Generator owner(s) and
convey any technical considerations that might affect their
installation plans before applying these general guidelines.
The following general rules apply to gaseous fuel system
piping:
• The piping should be of a material that conforms to
federal and local codes, rigidly mounted and protected
against vibration.
• Install flexible gaseous pipe (supplied) between the Home
Standby Generator fuel inlet port and rigid piping.
The supplied flexible gaseous pipe is not to be installed
underground or in contact with the ground.
• The entire flexible gaseous pipe must be visible for periodic
inspection and must not be concealed within, contact, or run
through any wall, floor, or partition.
More user manuals on
Briggs & Stratton Power Products Home Standby Generator
Installation, Start-Up and Owner's Manual
WARNING
In no way
should this information
CAUTION
ManualsBase.com
• Piping must be of the correct size to maintain the
required supply pressures and volume flow under varying
conditions.
• Use an approved pipe sealant or joint compound on all
threaded fittings to reduce the possibility of leakage.
• Installed piping must be properly purged and leak tested,
in accordance with applicable codes and standards.
Consider the following factors when planning to
install the fuel supply system:
The Home Standby Generator engine is fitted with a fuel
mixer system that meets the specifications of the California
Air Resources Board for "tamper-proof" dual fuel systems.
The unit will run on natural gas or liquid propane.
• A minimum of one manual shutoff valve should be placed
in the fuel supply line and located outside the building to
facilitate servicing the generator.
• Natural gas fuel supply pressure at the generator's fuel
inlet port should be between 5 to 7 inches of water (in.
W.C.) at full load. LP fuel supply pressure should be 11 to
14 inches of water (in.W.C.) at full load.
The Home Standby Generator unit has been
factory set to run on natural gas. If you need to
change from natural gas to LP gas, the unit will need to be
reconfigured, as described on page 18.
It is recommended that the fuel connection incorporate
the following components:
• A manual fuel shut-off valve located in the interior of the
building.
• A manual fuel shut-off valve located outside the building,
just before the generator unit.
• The termination of hard piping should include a sediment
trap.
• A manometer port should be provided.