Fixing The Stress Plates - SFS isoweld 3000 Instrucciones De Operación

Ocultar thumbs Ver también para isoweld 3000:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Fixing stress plates
NOTIC E
USE ONLY SFS MARKED PLATES
Welding with plates without an SFS
stamp may result in roof assembly failure.
Fix the stress plates in accordance with the wind load calculation.
Use the specified fastener.
isoweld
stress plates must be stored dry, covered and protected from
®
sunlight to prevent soiling and damage caused by UV radiation. The isoweld
stress plates must not be exposed to the elements for more than 24 hours.
Only set as many stress plates as can be welded on that day.
Ensure that the stress plates are dry and clean, both in storage and during
and after installation.
When installing on EPS/XPS thermal insulation, an FI-Pad must always be
used, even when a fleece is placed between the EPS/XPS thermal insulation
and the waterproof membrane.
The FI-Pad must be placed directly under the stress plate.
underdriven
Check the setting depth of the stress
plates (see figure below).
The stress plates must be set parallel to
the surface.
Incorrectly installed stress plates
adversely affect the quality of the weld.
correct
FI-Pad
min. 2 mm
overdriven
®
43

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para SFS isoweld 3000

Este manual también es adecuado para:

Isoweld backpack

Tabla de contenido