Welding The Membrane At The Fastening Points - SFS isoweld 3000 Instrucciones De Operación

Ocultar thumbs Ver también para isoweld 3000:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8. Welding the membrane at the fastening points

Proceed with the welding process in accordance with the isoweld
operating instructions.
For an efficient process, we recommend the following procedure:
1. Place at least 10 magnets to the right of the points to be welded (A).
2. Weld the first of these points (B).
3. Place the magnet on to this fastening point within 3 seconds of completing
the welding (C).
4. Proceed to weld the following points 2 to 10 as described in steps 2 and 3
(D).
5. Move the isoweld
(E).
6. Proceed to weld points 11 to 20 of the line on the left, as described in steps
2 to 4.
7. etc.
1.
.
2.
3.
A
1.
2.
3.
C
11.
12.
.
13.
14.
1.
2.
3.
4.
E
46
induction tool to the starting point of the next line (point 11)
®
4.
.
5.
.
6.
7.
7.
8.
9.
10.
4.
.
5.
.
6.
7.
7.
8.
9.
10.
15.
1 .
16.
.
17.
7.
18.
19.
20.
5.
6.
7.
8.
9.
10.
1.
2.
3.
4.
.
B
1.
2.
3.
4.
.
D
5.
.
6.
7.
7.
8.
9.
10.
5.
.
6.
7.
7.
8.
9.
10.
®

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para SFS isoweld 3000

Este manual también es adecuado para:

Isoweld backpack

Tabla de contenido