Corghi ERCO 4004 Manual De Uso página 85

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 171
RESERVED TO THE INSTALLER
CHECK TO BE CARRIED OUT WHEN THE INSTALLATION IS COMPLETE
MOD. 2HYD
VERIFICA DA COMPIERSI AL TERMINE DELL' INSTALLAZIONE
1. CHECK OF SCREW SECURING LIFT TO FLOOR CORRECT INSTALLATION AND SEALING CAPACITY
2. CHECK OF CORRECT ELECTRIC HOOK-UP (ACCORDING TO STANDARDS)
SOLLEVATORE Modello........................................................................ N° matricola.......................................................
3. CHECK OF CORRECT OPERATION (ACCORDING TO MANUAL)
4. CHECK CORRECT INSTALLATION AND MOVEMENT OF THE ROPES
5. CHECK CORRECT ALIGNMENT OF THE RUNWAYS WITH STRETCHED ROPES
6. CHECK OF MECHANICAL SAFETY DEVICES CORRECT ENGAGEMENT
1. CONTROLLO CORRETTA INSTALLAZIONE E TENUTA VITI DI FISSAGGIO AL PAVIMENTO
7. CHECK CORRECT ALIGNMENT OF THE RUNWAYS WITH SAFETY LOCKS ENGAGED
2. CONTROLLO CORRETTO ALLACCIAMENTO ELETTRICO (SECONDO NORME)
8. CHECK OF THE ELECTRIC SAFETY DEVICE CORRECT OPERATION
3. CONTROLLO CORRETTA ALIMENTAZIONE PNEUMATICA (SE PRESENTE)
9. CHECK OF EMERGENCY SWITCH / DISCONNECTOR
4. CONTROLLO CORRETTO FUNZIONAMENTO (SECONDO MANUALE)
10. CHECK CORRECT OPERATION OF THE "FCS" SAFETY LIMIT SWITCH
5. CONTROLLO CORRETTO FUNZIONAMENTO DEI SISTEMI DI SICUREZZA ELETTRICI
11. CHECK CORRECT OPERATION OF (FC1, FC2, FC3, FC4) SAFETY LIMIT SWITCHES
6. CONTROLLO FUNZIONAMENTO INTERRUTTORE/SEZIONATORE D'EMERGENZA
7. CONTROLLO CORRETTO INSERIMENTO SICUREZZE MECCANICHE
12. CHECK OF HYDRAULIC SYSTEM PERFECT SEALING
8. CONTROLLO CORRETTO INSERIMENTO BLOCCABRACCI
13. CHECK OF OIL LEVEL
9. CONTROLLO CORRETTO MONTAGGIO SALVAPIEDI
14. CHECK OF EMERGENCY LOWERING OPERATION
10. CONTROLLO PERFETTA TENUTA DELL'IMPIANTO IDRAULICO
15. CHECK OF LABEL APPLICATION ACCORDING TO DIAGRAM
11. CONTROLLO LIVELLO OLIO
16.CHECK CORRECT LUBRICATION OF THE ROPES AND OF THE GUIDES
12. CONTROLLO FUNZIONAMENTO DISCESA DI EMERGENZA
17. FULL-LOAD LIFT TESTING
13. CONTROLLO APPLICAZIONE ADESIVE SECONDO SCHEMA
18. DOCUMENTS CHECK (Instruction manual, Declaration of Conformity and Inspection records)
14. CONTROLLO CORRETTA LUBRIFICAZIONE SCORRIMENTI
19. TRAINING OF THE PERSONNEL AUTHORIZED TO USE THE LIFT
15. COLLAUDO SOLLEVATORE A PIENO CARICO
20. INSPECTION RECORDS FILLING OUT
16. CONTROLLO DOCUMENTAZIONE (libretto istruzioni & Dichiarazione di Conformità)
17. ADDESTRAMENTO DEL PERSONALE AUTORIZZATO ALL'UTILIZZO DEL PONTE
NOTE
Date:
DATA
_____________ / ____________ / ____________
User: Stamp and Signature
RISERVATO AL TECNICO INSTALLATORE
Utilizzatore:
Timbro e Firma
YES
NO
SI
NO
Tecnico installatore:
Timbro e Firma
Installer: Stamp and Signature
NOTES
NOTE
43

Publicidad

Tabla de contenido
loading

Tabla de contenido