enGLISH
Initial operation
6.
InITIAL OPeRATIOn
6.1
checking the parts of delivery
• Check delivery for completeness and damage caused by transport.
• Report any missing parts or damage caused by transport to your supplier immediately.
6.2
Included with the machine
Subject to modifications.
QTy ARTIcLe
1
Pipe cutting and beveling machine
1
Transport case
1
Set of stainless steel caps
1
Saw blade, Code 790 ...
1
Mounting plate
1
Line laser with fastening screw**
1
Tool key set
1
Tube of saw blade lubricant GF TOP
1
Bottle of special gear oil (Code 790 041 030)
1
Set instruction manual and spare parts list
*
The automatic and manual feed module AVM/MVM is already fitted to the pipe cutter upon delivery.
** The line laser is already mounted at the GF 4 (AVM/MVM) on delivery. At the GF 6 (AVM/MVM) the line laser is supplied
eparately and has to be mounted on the machine before commissioning (see chap. 8.2, page 79).
74
ORBITALUM TOOLS GmbH D-78224 Singen www.orbitalum.com
GF 4
GF 6
(AVM/MVM*)
(AVM/MVM*)
x
x
x
x
x
x
...042 064
...043 018
x
x
x
x
x
x
x
x
x
x
x
x
GF 4, GF 6, RA 8, RA 12 (AVM/MVM)
RA 8
RA 12
(AVM/MVM*)
(AVM/MVM*)
x
x
x
x
–
–
...043 018
...043 018
x
x
–
–
x
x
x
x
x
x
x
x
[REV. 20190510] OC_GF_RA_BA_790142765_00__INH-02_EN