Maintenance And Repair; Operating Materials; Maintenance Intervals - salmson Rocsan SDL Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 85
English

8. Maintenance and repair

ELECTROCUTION hazard!
There is a risk of fatal electric shocks when
performing work on electrical devices. With
all maintenance or repair work, the pump
must be disconnected from the mains and
secured against being switched on again
without permission. Damage to the power
supply cable may only be rectified by a quali-
fied electrician.
UNAUTHORISED work could result in fatal
injuries!
Maintenance and repair work that impairs the
safety of Ex protection must only be carried
out by the manufacturer or authorised service
workshops.
Also note the additional information in the
appendix!
• Before any maintenance or repair work, the pump
must be deactivated and dismantled as described
in the "Decommissioning/disposal" chapter.
• After maintenance or repair work, the pump must
be installed and connected as described in the
"Installation" chapter.
• The pump is switched on as described in the
"Commissioning" chapter.
Note the following:
• All maintenance and repair work must be carried
out by Salmson customer service, authorised
service workshops or trained specialists with the
greatest of care and in a safe workplace. Proper
protective clothing is to be worn.
• This manual must be available to and observed
by the maintenance staff. Only maintenance
and repair work described in this manual may be
carried out.
Any other work and/or alterations to the con-
struction must only be carried out by Salmson
customer service.
• When carrying out work in basins and/or tanks,
the respective local protection measures must be
observed in all cases. A second person must be
present for safety reasons.
• Only lifting equipment that is in a technically
perfect condition and load-carrying equipment
that has been officially approved may be used for
lowering and raising the pump. Make sure that the
pump does not jam during lifting and lowering.
If the pump does jam, no lifting forces greater
than 1.2 times the pump weight must be applied.
The maximum permissible bearing capacity must
never be exceeded!
Make sure that the lifting gear, ropes and the
lifting equipment's safety devices are in perfect
working order. Work may only commence if
the lifting equipment has been checked and
found to be in perfect working order. If it is not
inspected, fatal injuries may result.
50
MAINTENANCE AND REPAIR
• Electrical work on the pump and the system must
be carried out by a qualified electrician. Defective
fuses must be replaced immediately. They must
never be repaired. Only fuses for the specified
electric current and of the specified type may be
used.
• If flammable solvents and cleaning agents are
used, naked flames and smoking are prohibited.
• Pumps that circulate fluids that are hazardous to
health or come into contact with such fluids must
be decontaminated. In addition, make sure that
no gases that are hazardous to health form or are
present.
If injuries are caused by fluids or gases that
are hazardous to health, apply the first-aid
measures specified on the notice at the working
premises and notify a doctor immediately.
• Make sure that the necessary tools and materials
are available. Order and cleanliness ensure safe
and smooth work on the pump. After working on
the pump, remove any used cleaning materials
and tools from the pump. Store all materials and
tools in their proper place.
• Operating materials should be collected in suit-
able containers and disposed of properly. Always
wear appropriate protective clothing when per-
forming maintenance and repair work. This must
also be disposed of properly.

8.1. Operating materials

8.1.1. Overview of white oil
The sealing chamber is filled with white oil that is
potentially biodegradable.
When changing the oil, we recommend the fol-
lowing oil types:
• Aral Autin PL*
• Shell ONDINA 919
• Esso MARCOL 52* or 82*
• BP WHITEMORE WOM 14*
• Texaco Pharmaceutical 30* or 40*
All oil types marked with "*" are approved for use
with foods in accordance with "USDA-H1".
Filling quantities
• Motor version "S": 900 ml
• Motor version "P": 900 ml
8.1.2. Overview of grease
The following lubricating grease can be used in
accordance with DIN 51818/NLGl Class 3:
• Esso Unirex N3

8.2. Maintenance intervals

To ensure reliable operation, various maintenance
tasks must be carried out regularly.
The maintenance intervals must be specified
according to the load on the pump. Regardless of
the specified maintenance intervals, the pump or
installation must be checked if strong vibrations
occur during operation.
When used in sewage lifting units inside
buildings or on areas of land, the maintenance
Wilo Salmson France SAS 11-2016 V05 DIN A4

Publicidad

Tabla de contenido
loading

Tabla de contenido