Replacing The Mains Fuse - Promax AE-966 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Check Battery/DC module installation status
Panel
1.- Press the System key.
operation
2.- Press F6 (More).
3.- Press F4 (System Config On). The
configuration appears.
4.- The Battery sign shows the installation
status, installed (checked) or not installed
(unchecked).
7.3

Replacing the mains fuse

The fuseholder lid is placed in the mains base:
1)
Disconnect the power cord.
2)
With an appropriate screw driver remove the fuseholder lid.
3)
Substitute the melt fuse for another of identical characteristics.
FUSE TYPE SHOULD BE 5 x 20mm, 250 V SLOW T and of
1.6 A.
AVOIDING THESE DIRECTIONS COULD DAMAGE THE
EQUIPMENT.
4)
Insert the fuseholder lid.
Page 180
USER'S MANUAL AE-966 / 967
System
More...
System Config
On
Off
Installed
Not installed
F 6
F 4
04/2016

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ae-967

Tabla de contenido