SEA MARK TANK E 270 Manual De Instalación página 8

Tabla de contenido

Publicidad

Sistemi Elettronici
di Apertura Porte e Cancelli
International registered trademark n. 804888
POSITIONING OF THE FRONT BRACKET
Once the operator is attached to the post and the leaf set in the closed position execute the following
operations:
1.
Release the operator (as in fig. 25)
2.
Pull-out completely the chromate shaft and push it back in 1cm
3.
Attach the shaft to the front bracket (Fig. 13)
4.
Set the operator perfectly levelled and mark the position of the front bracket (Fig.12)
Attention: avoid the welding of the front bracket to the shaft of the hydraulic operator already attached;
the welding scraps (daps) could ruin the chromium plating of the shaft.
Fig. 12
WELDING OF THE FRONT BRACKET TO THE GATE
The front bracket must be positioned so that the operator is perfectly levelled
According to the nature of the gate the front bracket (wood, steal, Aluminium) can be:
Front bracket screwed
46 mm
Fig. 14
8
67410019
®
70 mm
Front bracket welded
Fig. 15
REV 00 - 07/2013
MARK TANK E
English
English
70 mm
Fig. 13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mark tank e 390

Tabla de contenido