Tabla de contenido

Publicidad

DOSAGE

6.3 PREVIOUS FLOW TEST

IT IS ESSENTIAL THAT THE MACHINE, THE TRACTOR AND THE UNIVERSAL
JOINT SHAFT ARE ALL SWITCHED OFF.
To perform the test, follow these instructions:
1-
FILL THE HOPPER with seeds.
2-
COUPLE the machine to the trac-
tor in a SLIGHTLY ELEVATED PO-
SITION (wheels should not be in
contact with the ground).
3-
Loosen the 2 knobs (1, fig. 43) that
secure the venturi injector sluice.
Pull the venturi injector sluice into
the machine.
38
Fig. 41
Fig. 41
Fig. 42
Fig. 42
1
Fig. 43
Fig. 43

Publicidad

Tabla de contenido
loading

Tabla de contenido