18 Bout Tramlining Sequance
For use with 4 metre drill and an 18 metre sprayer. (2 x 2 left hand seed spouts are
closed on bouts 3 and 16, and 2 x 2 right hand seed spouts closed on bouts 7 and 12).
Starting on bout 1 requieres turning RIGHT at the end of the first bout.
NOTE
TO TURN LEFT AT THE END OF THE FIRST BOUT, ADVANCE THE BOUT NUM-
BER TO 10 BEFORE COMMENCING DRILLING.
The instrument will beep once the beginning of each tramline bout and the display
will flash for the duration of the tramline bout.
O/P1
(L/H)
1
2
3
4
4
m
18 metres
O/P2
(R/H)
5
6
7
8
9
O/P2
(R/H)
10
11
12
13
14
69
ELECTRONICAL CONTROLLER
O/P1
(L/H)
15
16
17
18
1