ELECTRONICAL CONTROLLER
10 Bout Tramlining Sequance
For use with 4 metre drill/10 metre sprayer, or 8 metre drill/20 metre sprayer combi-
nations. (2 x 2 left hand seed spouts are closed on bouts 4 and 7, and 2 x 2 right hand
seed spouts closed on bouts 2 and 9). Starting on bout 1 requieres turning RIGHT at
the end of the first bout.
NOTE
TO TURN LEFT AT THE END OF THE FIRST BOUT, ADVANCE THE BOUT NUM-
BER TO 6 BEFORE COMMENCING DRILLING.
O/P2
(R/H)
1
2
8
metres
20 metres
O/P1
(L/H)
3
4
5
68
O/P1
O/P2
(L/H)
(R/H)
6
7
8
9
10