Descargar Imprimir esta página

Yakima Q-TOWERS Manual Del Usuario página 4

Ocultar thumbs Ver también para Q-TOWERS:

Publicidad

Idiomas disponibles

Idiomas disponibles

Will you be installing your Q-Tower pairs on the FRONT or on the REAR?
For FRONT installation continue below. For REAR installation skip to step 11.
Set M1 and center bar.
TIP: To center crossbar between towers after setting your measurement use this
technique. While pushing downward and rotating the crossbar, adjust the crossbar as
needed to the left or right. Double check your m1 measurement and adjust if necessary.
Tighten tower/bar assembly.
Be sure to not
move the towers.
Label the towers.
Label towers with front of vehicle stickers.
1033430H-4/33
Note: Set measurements on a flat surface away from vehicle.
Pull the measuring tape tight to ensure accurate measurements.
Measurements must be accurate to within 1/8" (3.2 mm).
5Nm
M
1
1
M
Install end caps and correct pads.
Attach correct pads. Some vehicles require
different pads on front (m1) and rear (m3). Pad
letter is located in the center of each pad.
keep the pads clean and
free of debris. Clean pads
as necessary, and keep
them clean by not setting
them on a dirty surface.
fRONT Of VEHICLE
Snap the
covers shut.

Publicidad

loading