27
Hardware Needed:
(2) 1/4-20x5/8" Screws
Screws are preassembled with handles.
28
Hardware Needed:
(2) M4x10 Screws
Screws are preassembled with handles.
ASSEMBLY,
19
1/4 *15 2 PCS
20
预装。客户松开
ENSAMBLAJE
Detach sear burner from the assembled location.
Then take the HVR that was threaded out the
side of the cabinet. Hold the the gas valve and
unscrew (2) screws from sear burner gas valve.
Attach gas valve to front panel of sear burner
housing. Attach sear burner knob bezel and screw
components in place. Attach burner knob.
Gas Valve
STEP 27:
Attach sear burner
lid handle
17
STEP 28:
19