Descargar Imprimir esta página

Cequent Performance Products 50082 Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

1999 To 2010 Ford Super Duty F-250/F-350 & 2008 To 2010 F-450
8.
Loosely install the frame brackets as follows:
a.
For 1999 - 2004 vehicles: Use the hardware removed in Step 3 to attach the upper brake cable to the frame bracket as
shown in Figure 4b.
b.
Position the frame brackets so that the two rear attachment tabs on the bracket are on either side of the rear bed support,
as shown in Figure 1.
c.
Attach the bracket to the frame of the vehicle with the 1/2" u-bolts(8) nuts(2), and conical washers(3) as shown in
Figure 1. Hand tighten the nuts only.
d.
For 2008 and to 2010 trucks: Use the slot in the frame that is over the axle to attach the frame bracket with the 5/8"
carriage bolt(9). Make sure to use a 5/8" spacer(10) between the bracket and frame. See Figure 1. Attach the 5/8"(9)
bolt to the inside of the frame with 1/4" x 1-1/2" x 3" spacer(11), lock washer(12) and hex nut(13). Finger tighten only.
e.
For 1999-2007 trucks: Use the slot in the frame that is under the rear bed support to attach the frame bracket with the
5/8" carriage bolt(9). The 5/8" spacer(10) should not be used between the bracket and frame. See Figure 2. Attach the
5/8" bolt(9) to the inside of the frame with 1/4" x 1-1/2" x 3" spacer(11), lock washer(12) and hex nut(13). Finger
tighten only.
9.
Reposition the mounting rail over the holes.
10.
Install the 1/2" x 2" long carriage bolts with the U-shaped spacer to be located in the corrugation between the box and the rails.
Note: The U-shaped spacer will have to be installed before inserting the 1/2" carriage bolts through the mounting rail and box
floor. This insures a metal to metal contact. A U-shaped spacer is not needed for the attachment at the center of the rail. Attach
the carriage bolts on the ends of the rails with spacers(1), lock washers, and nuts as per the Figure 1 and tighten snug to keep the
mounting rail from moving. Attach the carriage bolt in the middle with a conical washer and nut.
11.
Place the unassembled fifth wheel saddles/slider/goose into the already installed mounting rail. Position the second mounting rail
with the saddles/slider/goose by inserting the tabs into the mounting rail and pushing the mounting rail tight towards the other
mounting rail. Ensure that the mounting rail is centered between the weld seams on the length of the truck box floor. This will
position the mounting rail in the correct location and ensure that the fifth wheel will have a snug fit to the truck. NOTE: If more
than one hitch product will be used with the rails then both should be used at the same time to align the second rail. This will
ensure that one product does not compromise the fit of the other.
12.
Repeat the previous steps for the other side of the vehicle.
13.
Tighten the fasteners in the following sequence: 1) torque the mounting rails to the frame brackets, 2) torque the frame brackets
Torque all 1/2" Grade 5 hardware to 72 ft-lbs (98 N-m), 5/8" Grade 5 hardware to 150
to the truck frame.
ft-lbs (204 N-m) and the 5/8" Grade 8 hardware to 212 ft-lbs (287 N-m).
14.
On 2005 to 2010 Gas Engine Vehicles Only. Use the factory flange nut that was removed in Step 2 to tighten the tube holder
onto the L-bracket (7) as shown in Figure 3c.
15.
Reinstall spare tire if it was removed.
z
2011 Cequent Performance Products, Inc.
Installation Instructions
CUSTOM QUICK INSTALL MOUNTING KIT
Sheet 3 of 21
50082N
Part Numbers:
50082
5/5/11
Rev. D

Publicidad

loading