Top Assembly Instructions - Hog Slat Grower SELECT HSES Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Evaporative Cooling System
1. Install the Top Support Flush with the header boards as shown in Figure 1. As shown above in Figure 1
there should be a 2"X4" spacer located behind the Top Support. (Please note that this spacer should
terminate when the Top Support ends). At this time the Top Support should be fastened to the header
bar with two screws (80509) on the far ends. This should be replicated throughout the length of the
system.
2. The Spray Bar Support should be fastened to the Top Support with two screws (80509) and two washers
(605791) as shown in Figure 10 below. This process should be replicated throughout the length of the
system.
3. The Spray Deflector should be fastened to the Top Support using self tapping sheet metal screws
(60926) as shown in Figure 11 below. The Spray Deflector should be fastened to the Top Support first
utilizing the middle two holes as well as on the two ends where End Panels reside.
4. The Deflector Splice should be fastened to the Spray Deflector anywhere there is a meeting of two Spray
deflectors with sheet metal screws (60926) as shown below in Figure 12. This process should be
replicated throughout the length of the system.
Hog Slat Inc. Newton Grove, NC USA November 2018
Figure 10

Top Assembly Instructions

Figure 12
Figure 11
12

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido