Evaporative Cooling System
1. Begin by mounting the pump plate either to the Pump Plate Side Support Brackets or by anchoring the
Pump plate to the concrete. Both methods are shown in Figures 20 and 21 below.
2. Place the Pump on the plates so the intake is oriented towards the system.
3. Utilizing supplied bolts (605082), lock washers (60589) and nuts (60624), secure the Pump to the Pump
Plate.
Hog Slat Inc. Newton Grove, NC USA November 2018
Figure 20
IN LINE JET PUMP
Pump Assembly Instructions
Figure 21
18