Evaporative Cooling System
Figure 2 above shows the typical spacing for 2"X4" studs during framing along with typical spacing for the Trough
Support Brackets (If Applicable). Table B and Table C provide the total framed opening requirement and
minimum distance from the ground to the base of the Trough Support Bracket respectively.
Beginning at the end of the system opposing the pump, the first bracket should be located to support the
end cap with the extrusion. The second should be placed to support the trough halfway between the end
cap and the coupler. The third should be located to support the trough coupler. This process should be
repeated through the length of the system.
(ENSURE ALL CONNECTIONS ARE SUPPORTED WITH MOUNTING BRACKETS
BRACKETS SHOULD BE SPACED NO GREATER THAN 5 FEET APART, IN SOME
INSTACES SMALLER SPACING MAY BE DESIRED AND CAN BE ACHIEVED BY
If the system is wall mounted, the pump plate side brackets should be installed as shown in Figures 3 &
4. Figure 3 shows End Feed configuration, Figure 4 shows the center Feed Configuration.
Hog Slat Inc. Newton Grove, NC USA November 2018
Figure 2
40.00 Inch
Recommended
ORDERING ADDITIONAL BRACKETS)
40.00 Inch
Recommended