Entrance Plumbing Instructions (In Line Jet Pump) - Hog Slat Grower SELECT HSES Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Evaporative Cooling System
1. Begin by marking the center point of the intake hole 1.75" from the bottom of the trough and no less than
18" from the end of the system for an end feed configuration. For a center feed configuration, the center
point should be marked 1.75" from the bottom of the trough aligned on the linear center of the system.
2. Drill a 2.375" inch diameter hole centered on the point marked in the step before.
Make sure PVC shavings are cleaned from tank after fabrication
3. Secure Bulk Head Fitting and tighten to create a water tight seal.
4. Beginning with the 1 ½" Male PVC Adapter exiting the tank assemble the plumbing to the Pump Intake as
shown below in Figure 24.
Hog Slat Inc. Newton Grove, NC USA November 2018
IN LINE JET PUMP
Entrance Plumbing Instructions
Figure 24
20

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido