Berkel BV 400/25 Manual De Uso Y Mantenimento página 24

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Instruction manual for vacuum chamber packaging machines Mod. BV 400/25 - BV 600/60
Instruction manual for vacuum chamber packaging machines Mod. BV 400/25 – BV 400/25H – BV 600/60
Rev. 01 - 04/2019 - Cod. 1500656 - Instruction manual for vacuum chamber packaging machines Mod. C46-C46H-C62
9
work CyClE ENd: The appliance ends the cycle automatically after the sealing bar cooling, with air re-
entering the chamber resulting in opening of the lid. Remove the packed product and check the bag seal: it
must be uniform, clearly marked without melted points. If necessary, adjust the preset values and proceed
with the second cycle.
INTErruPTINg THE work
The work cycle can be interrupted at any moment by pressing SToP
re-entering the chamber. The work cycle can also be interrupted by means of the main switch; the cycle is
interrupted but air does not re-enter the suction cup: the lid therefore remains closed.
When the machine is switched on again, the cycle is reset, air returns to the chamber and the lid opens.
ProCEEdINg To THE SuCCESSIvE PHaSE IN advaNCE
It is possible to proceed to the successive function before reaching the maximum value, by pressing SEl
oPEraTIoN wITH gaS fuNCTIoN
To include the gaS option, proceed as follows:
1
CoNNECTINg THE gaS CylINdEr: Connect the gas cylinder to the machine by pushing the tube
onto the special connector
specialized suppliers), then use the pressure reducer
pressure to 0.5 ÷ 1 bar.
24
B
located on the rear panel. Open the valve on the cylinder
8
: interruption is immediate with air
, supplied with the cylinder, to regulate the cylinder
d
C
6
a
(provided by
C
a
d
B
gaS
.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bv 400/25hBv 600/60

Tabla de contenido