Chap. 4. Transportation, Put On Service And Use; Assembly / Disassembly - HURAKAN TMC Manual De Instruccion

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 28
CHAP. 4.
TRANSPORTATION, PUT ON SERVICE AND USE
WORK PLACES AND OPERATORS TASKS
As described in the instructions manual for the use, the machine is designed to be driver from an operator trained and
qualified on the residual risks, but with the competences, in matter of safety, of the maintenance employees.
The work normal zone of the operator is:
1.
The machine lateral zone near the loading mouths (defined loading zone) in functioning normal conditions for the
manual loading operations of the food product and during the pestle use to convey the food product within the machine
neck, with the fixed and moving shelters in closed and blocked position;
2.
The machine anterior zone near the food product loading zone in functioning normal conditions for the manual withdraw
of the food product stored in an appropriate container, with the fixed and mobile shelters in closed and blocked position
PREPARATION PRELIMINARY OPERATIONS
STABILITY
The machine stability is designed so that, in the foreseen functioning conditions, taking into considerations of the climatic
conditions, is such to allow the use without the pouring risk, falling or untimely moving.
Taking into consideration of the conformation and its position, the machine results to be essentially steady without needs of
work bench fastening.
All support pressure feet placed under the base must support on a solid surface, uniform and well leveled.
ELECTRICAL FEEDING
The electrical feeling connection must be in conformance with the legislation relevant to the state in which is used.
The electrical feeding must so be maintained in conformance with the following technical prescriptions:
1.
the electrical feeding must be always of the type and have an intensity corresponding to the specifications listed in the
machine plate. If excessive voltages are applied, some components will be damaged irreparably,
2.
a differential device must be foreseen coordinated with the protection circuit, respecting the legislation and the actual
legislative and prescribed disposals in the operative installation country;
3.
the cable for the electrical feeding outside the machine container, must be made pass in the spaces prepared from
You and adequately protected;
4.
if present the neutral cable (N) before to feed the electrical equipment, as for you must be guaranteed its continuity
(connected and available).
5.
before to feed the electrical equipment, as for you must be guaranteed its continuity (connected and available) of the
yellow green cable of the protection equipotential circuit.

ASSEMBLY / DISASSEMBLY

The assembly / disassembly operations of any machine member are performed with the stopped machine
and with the plug disconnected to the socket, or with the sectioning device in OFF.
The tools assembly on the machine performs in different phases:
1.
Insert the appropriate hopper (1)
supplied with the machine in the
grinding neck
2.
Slacken the block knob (2) of the
moving shelter (3) and open it;
3.
Insert the desired cone (4)
tightening it with the die (5) through
the key (6) supplied in endowment
4.
Prepare the harvest container (7)
5.
close the moving shelter (3) and
tighten the block knob (2) ;
6.
In these conditions the machine is
ready to work.
The disassembly activities perform following in backwards way the assembly phases previously described.
ORIGINAL INSTRUCTIONS TRANSLATION
Pag
di
8
13

Publicidad

Tabla de contenido
loading

Tabla de contenido