OPERATION
AC PARALLEL OPERATION (optional equipment)
Both types of EU22i generator can be connected to each other to
increase the available power using a receptacle box.
Before connecting an appliance to either generator, make sure that it
is in good working order and that its electrical rating does not exceed
that of the receptacle.
Most motorized appliances require more than their electrical rating for
startup. When an electric motor is started, the overload indicator (red)
may come ON. This is normal if the overload indicator (red) goes OFF
within 4 seconds. If the overload indicator (red) stays ON, consult your
generator dealer.
During parallel operation, the Eco Throttle switch should be in the
same position on both generators.
1. Install the receptacle box for parallel operation on to the one
generator and secure it with setting band as shown.
• Set the belt on the front side of the handle.
• Secure the narrow belt to the handle with the velcro fastening.
• Pass the upper wide belt through the lower belt hook and secure
with the velcro fastening.
• Route the receptacle box wires under the engine switch.
• Install the belts so they are not slack.
NARROW BELT
VELCRO FASTENING
RECEPTACLE BOX FOR
PARALLEL OPERATION
(optional equipment)
36
HANDLE
WIDE BELT
VELCRO FASTENING
LOWER BELT HOOK
ENGINE SWITCH