The live analysis does not claim to be completely
accurate. However, it is recommended to check the
installation and configuration in case of deviating
specifications:
If the current direction is incorrect: Check instal-
lation of the current converters and the connec-
tion of the power converter lines on the device to
ensure that the individual power converters were
not connected the wrong way round.
If the phase deviates: Check that the current
converters are installed at the correct phase and
adapt the configuration of the phase in the web
application for the current converter if necessary.
9. Home installation: Configure power sour-
ces
Define the connected current converter for each
phase of the house connection and for other power
sources at the place of use (e.g. photovoltaic sys-
tem).
House connection
Only the current converters created in Step 8 are
displayed.
1. Assign a current converter to a phase.
2. If necessary, add further current converters in
step 8.
Photovoltaic system
If the place of use has a photovoltaic system, infor-
mation about the type of connection and feed-in re-
muneration is required for energy management.
1. Enable the function.
2. Select the type of connection of the photovoltaic
system:
Optional
Explanation
Load-con-
The system is connected to the
nected/
power grid after the house con-
excess feed-
nection.
in
Excess power from the photovol-
taic system flows via the house
connection into the grid (in this
case, the current that the energy
manager measures at the house
connection may be positive).
Grid-side/full
The system is connected to the
feed-in
power grid upstream of the house
connection. The power from the
photovoltaic system is fed di-
rectly into the grid.
Example
Shows the two configuration
types in one example.
Phase and current converters
If a photovoltaic system is installed, the phases can
be selected and the current converters can be as-
signed here.
1. Select the number of phases.
2. Assign current converter.
3. If necessary, add further current converters in
step 8.
Information
Additional current converters are available as spare
parts from your Porsche partner.
Starting Initial Installation
Information
In the case of load-side installation or excess feed-in,
the assignment of current converters is not manda-
tory for the use of the self-consumption optimization
function. In this case, only the number of phases
must be selected. However, this does not guarantee
complete energy statistics.
10. Home installation: Enter current con-
sumers
Existing current consumers (e.g. garage, sauna) and
EEBus devices (e.g. charger Porsche Mobile Charger
Connect, Porsche Mobile Charger Plus) are specified
here and the current converters are assigned to the
phases used accordingly.
EEBus describes a communication protocol that is in-
tegrated in the Porsche Mobile Charger Connect, for
example. If both the energy manager and an EEBus
device are in the same network, the protocol enables
both devices to be paired.
It is important to note the following requirements
when adding a load:
The current consumer or EEBus device must
have a current sensor for each phase.
The number of phases in the supply cable of
the EEBus device are known and are configured
accordingly.
For each of the current consumers shown here, the
power supply can be displayed in the Overview and in
History.
61