Descargar Imprimir esta página

Pit Boss PRO Serie Montaje Y Operación página 12

Ocultar thumbs Ver también para PRO Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

15. ATTACH THE SIDE SHELF
Parts Required:
1
x
Side Shelf (#22)
3
x
Tool Hooks (#G)
Screw ( #H)
2
x
Installation:
On the edge of the Side Shelf with three holes, install the tool hooks
into each hole along the edge. The tool hooks will secure to the nut
that is pre-mounted on the inside. Note illustration 15A.
Place the Side Shelf onto the Side Shelf Brackets and from underneath
secure each side with a screw on the inside edge of the Support
Bracket. Note illustration 15B.
IMPORTANT: Moving or lifting the grill by the side shelf will break
the shelf, which is not covered by warranty.
16. CONNECT CONTROL BOARD TO THE MAIN CABINET
Parts Required:
Electrical Wire Box ( #19)
1
x
Electrical Wire Box Lid ( #18)
1
x
8
x
Screw ( #C)
Installation:
Carefully move the control board wires through the holes on the
Electrical Wire Box, shown in illustration 16A. Secure it to the Main
Cabinet with screws. Connect the wires before placing the lid on the
wire box.
Lastly, place the Electrical Wire Lid over the box and secure it with
screws on each corner.
12
15A
22
15B
H
H
16A
C
19
C
16B
C
C
18
C
C
G
C
C

Publicidad

loading

Este manual también es adecuado para:

Pbv6pse513953211007