4. Set two o 76 mm diameter bands 3 on the pipe loosely those bands are used or
tightening the solution discharge le er and tube joint later .
Assemble the second no le 11 with straight pipe.
ighten them with another 76 mm diameter band 3 .
5. ut the solution discharge le er 12 onto the pipe.
Make sure that the open side o the le er s base 13 aces the swi el pipe.
Align the le er s base with the gap o the projection on the straight pipe 14 .
hen tighten them with the 76 mm diameter bands 3 .
6. Make sure all clamps are tight.
Adjusting and securing the control handle
1. ut the machine on your back and adjust the shoulder strap see Adjusting the
shoulder strap .
2. Slide the control handle 1 along the tube to the most com ortable position.
3. Secure the control handle by turning the knob 2 .
Installing the end pipe (optional accessory for blower
operation)
WARNING:
rain all chemical solution rom the solution hose 1 and tube joint 2 , and make
sure the solution discharge le er 3 is closed be ore installing the end pipe.
therwise chemical solution may be spilled out.
1. emo e the solution hose rom the tube joint by loosening the hose band.
2. emo e the 76 mm band, and remo e the second no le rom the straight pipe.
( 3)
12
(3)
(3)
(
)
(
)
(3)
(1)
(3)
( )
( )
( )
( )