Descargar Imprimir esta página

MBM FB74AXS Manual De Uso E Instalación página 38

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 79
permitted), previously made suitable, of
the appliance.
The tasks of levelling and securing in-
clude: adjustment of the appliance as
a single independent unit.
Place a spirit level on the structure
(detail D).
Adjust the levelling feet (detail E) ac-
cording to the indications provided by
the level.
Perfect levelling is achieved by
adjusting level and feet on the
width and depth of the appliance.
"SERIES" ASSEMBLY / see SECT.
IMAGES - REF. d)
In the models provided, remove the
knobs and unscrew the screws for the
fixing of the panel (detail F).
Flammable walls / The mini-
mum distance of the appliance
from the side walls must be 15
cm and from the rear wall must be 20
cm. If it is lower, insulate the walls
close to the appliance with fireproof
and / or insulating treatments.
Install the appliances so as to
exclude any accidental contact
with high temperature surfaces,
Before proceeding with the
operations, see "General sa-
fety information".
These operations must be per-
formed by qualified and au-
thorised operators, in accord-
ance with the laws in force and using
the appropriate materials described.
Generally, the appliance is
delivered
mains supply cable, without
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
POSITIONING AND HANDLING
POWER SUPPLY CONNECTIONS
without
electric
- 10 -
including hot combustion fumes coming
out of the chimney (see identification
with High temperatures warning label
and description on page 2), to people
who transit and / or operate within the
work environment.
To place the equipment adherent
each other perfectly (part G). Level
the equipment as described above
(detail E).
Insert the screws in their housings
and lock the two structures with the
locking nuts (part H1-H3).
Replace the protective caps between
the devices (part H2).
Repeat, if necessary, the sequence of
leveling and fixing operations for the
remaining equipment.
If necessary, repeat levelling and
fixing operation sequence for the re-
maining equipments.
INTRODUCTION
(OPTIONAL) see SECT. IMAGES
- REF. d). / In order to introduce the
terminal, position it and fix it with the
equipped screws provided (detail L1).
Once the described operations have
been carried out, position again the
panels and knobs of the different ap-
pliances in the respective housings.
pipes for connection to the water,
drainage and gas networks.
GASPOWER CONNECTIONS -
see SECT. IMAGES - REF. e).
Features of the installation site /
The premises for installation of the ap-
pliance (type A1 under hood) must be
equipped with features such as:
Air premises according to the provi-
sions required by the local regulations
OF
TERMINAL
4.

Publicidad

loading