3 INSTALLATION
Insert 4 M6 threaded grub screws into the threaded holes, and screw
down without tightening.
spacer
Ensure that foam rubber spacers are present at the screw anchor points.
Lay the air conditioner on the frame with the seal and the captive screws
mounted, using the captive screws as a centring guide with respect to the
frame.
Do not apply additional sealant between the air conditioning system
and the roof.
If the device has been carried upside down from the horizontal moun-
ting position, wait 2 hours before switching it on.
Remove the protective film from the device on the white outer cover.
76