Programming And Startup; Connection To The Power Supply And Checking Of Turning Direction; Controls And Commands - Erreka RINO Serie Manual Del Instalador

Accionador para puertas corredera
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

PROGRAMMING AND STARTUP

1

CONNECTION TO THE POWER SUPPLY AND CHECKING OF TURNING DIRECTION

The correct operation of the operator and of the
complete system will only be achieved after
programming. However, prior to programming, it is
necessary to carry out the checks listed below.
Before carrying out any gate movement,
ensure there is no person or object in the radius
of action of the gate and the operation
mechanisms.
2

CONTROLS AND COMMANDS

58
Installation Guide
1 Connect the control panel power supply.
2 Check the turning direction of the operator using
the mini-pushbuttons PUL1 (close) and PUL2 (open).
If the turning direction of the operator is not
correct, interchange the connection cables (black
cables) in their corresponding connector (see
"Electrical connections" on page 56).
SW1
Main switch
SW2
Programming DIPs
ST1
Total operation mini-pushbutton
ST2
Pedestrian operation mini-pushbutton
PUL1
Close mini-pushbutton
PUL2
Open mini-pushbutton
T.LG
Garage light time regulation (3-90 seconds)
T.E
Standby time regulation (0-90 seconds)
(only functional in automatic mode)
P.M
Torque adjustment

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rino ris600ecRino ris1000ecRino ris600ecmRino ris1000ecm

Tabla de contenido