Descargar Imprimir esta página

Hitecsa ADVANCE EQRU-EQRUSS 2160 Manual De Instalación, Uso Y Mantenimiento página 95

Enfriadoras de agua y bombas de calor con condensación de aire y ventiladores helicoidales. serie de compresores herméticos scroll y refrigerante r32

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Checking of compressor oil level
START
Is the oil level sufficient?
ᐁ YES
Was pre-heating activated at least 12 hours before start-up?
ᐁ YES
The general conditions of the unit are compliant!
(*) The unit is equipped with a function that prevents starting, if the minimum heating time of the compressor crankcase heaters is not respected; this time
is evaluated by the software according to the outdoor air temperature (see Electronic Control manual).
Checking the water connections
START
Have the water connections been made to a professional
standard?
ᐁ YES
Is the water inlet/outlet direction correct?
ᐁ YES
Are the circuits full of water and have the pipes been bled of
any air residue?
ᐁ YES
Does the water flow conform to what is stated in the user
manual?
ᐁ YES
Do the pumps turn in the right direction?
ᐁ YES
Are the flow meters (if installed) active and correctly con-
nected?
ᐁ YES
Are the water filters placed upstream from the heat ex-
changer and recovery unit in good working order and cor-
rectly installed?
ᐁ YES
The water connections are compliant!
Checking safety valve connections
START
Has the discharge of the safety valves been channelled?
ᐁ YES
The diameter, length and number of elbows comply with the
parameters in the table in paragraph Guidelines for the in-
stallation of units
ᐁ YES
Does the connection terminate by discharging outside at
least 3m above ground level and away from ignition
sources?
ᐁ YES
The connection of the safety valves is compliant
Checking electric connections
START
Does the unit power supply match the values indicated on
the plate?
ᐁ YES
Is the phase sequence correct?
ᐁ YES
Does the earth conform with current regulations?
ᐁ YES
Are the power circuit electric conductors of the size indi-
cated in the manual?
ᐁ YES
IOM_EQRU-SS_EQRHU-SS_2160a4350_208676_230601_ES-EN-FR-DE-IT
95
Top up as necessary
NO
Activate pre-heating and wait 12 hours (*)
NO
Bring the connections up to standard
NO
Correct the inlet/outlet direction
NO
Fill the circuits and/or bleed the air
NO
Correct the water flow rate
NO
Correct the rotation direction
NO
Repair or replace the component
NO
Repair or replace the component
NO
Connect the exhaust of the safety valves as set forth in para-
NO
graph Guidelines for the installation of units
Modify the connection
NO
Modify the position of the exhaust
NO
Restore the correct power supply
NO
Restore the correct phase sequence
NO
NO
Danger! Restore the earth connection!
NO
Danger! Replace the cables immediately!
EQRU-EQRUSS
EQRHU-EQRHUSS

Publicidad

loading