Descargar Imprimir esta página

GE Profile PFDS450 Manual Del Propietario E Instalación página 31

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
BOTTOM VENTING (cont.)
ADDING
A NEW DUCT
Reconnect
the cut
portion
A of the
duct to the blower
housing.
Tape
the
elbow
in
a
90-degree
position to prevent
rotation.
Fixin(
Portion "A"
Insert
the
elbow
through
the
rear
hole and
connect
it
to
portion
A.
Rotate
the
elbow
through
the
bottom opening.
opening
While holding down
the pipe and elbow,
using
your
hand
through
the
rear
opening, drill a 1/8"
hole
through
the
bottom tab hole and
the pipe as shown
in the illustration.
f .....
NOTE: Make sure the
hole is drilled
all the
way
through
the elbow and pipe.
CAUTION: Be sure n ot t opull or
damage
the electrical
wires inside the dryer when
inserting
the duct.
While
still
holding
down
the
pipe and elbow
from
the
rear
opening,
screw
the pipes in place with the
previously
saved screw.
Apply duct tape as shown
on the joint
between
the
dryer internal
duct and the
elbow.
NOTE: Make sure the tape
covers
the
screw
hole in
portion A where it connects
to the elbow.
J
Duct tape
/
A CAUTION:
Internal
duct joints
must
be secured with tape; otherwise,
they may
separate
and cause a safety hazard.
Dryer
Exhaust
to the bottom
of cabinet
for
Gas and Electric
models.
ADDING
COVER
PLATE TO REAR OF CABINET
(BOTTOM
EXHAUST)
Connect
standard
metal
elbows
and
ducts
to
complete
the exhaust system. Cover back opening
with a plate
(Kit WEIM454)
available
from
your
local service provider. Place dryer in final location.
WARNING - NEVER LEAVETHE
BACK OPENING WITHOUT
THE PLATE. (Kit
WEIM454)
31

Publicidad

loading